Near Dickens (60 mi from Lubbock), Dickens County, TX · ERCOT
CoreWeave leases 526MW critical IT for 15 years (800MW total leased), ~$1B/yr avg revenue across three phases. ERCOT-approved capacity raised to 1.63GW (Jan 2026); 3,400MW+ total potential; 1,500+ acres controlled. Phase I 133MW critical IT delivery by end Q2 2026.
The essential facts on record for this project and how confident we are in them.
Site imagery and location context.
No imagery on record yet.
Every organization and person with a known role in this project, with the evidence behind each relationship.
| Role | Party | Assertion | Confidence | Start | End |
|---|---|---|---|---|---|
| developer | Galaxy Digital Inc. | reported | low | Unknown | current |
| tenant | CoreWeave | reported | low | Unknown | current |
How big this project is, by each distinct measure. These figures measure different things and are never added together.
| Type | Kind | Scope | Value | As of | Assertion | Confidence |
|---|---|---|---|---|---|---|
| announced campus | actual | Campus | 1,630 MW |
The project's path to utility power: interconnection requests, approvals, and delivery infrastructure.
Power generated on site without going through the utility grid.
Gas supply arrangements feeding on-site generation.
Where the project's water comes from and how the facilities are cooled.
Network connectivity: routes, carriers, and diversity.
The land under the project and how far the site could ultimately grow.
Who is building the project and the major equipment on order.
What the project costs, how it is financed, and the commercial agreements behind it.
Permits, zoning, tax arrangements, and public incentives.
Every dated event on record, newest first. Superseded entries stay visible.
What changed in this record recently, and why.
| Date | Field | Change | Cause |
|---|---|---|---|
| 2026-07-15 | generalized centroid | (empty)->{"lat":33.615363,"lng":-100.787617,"accuracy":"county","g... | geocode |
| 2026-07-15 | capacity rollup | {"rollup":{},"headlineMw":null}->{"basis":"announced_campus","rollup":{"announced_campus":... | system rollup |
| 2026-07-15 | executive summary | (empty)->CoreWeave leases 526MW critical IT for 15 years (800MW to... | claim accepted |
Our readiness assessment across thirteen dimensions, plus known risk notes and open questions.
| Dimension | Rating | Conf | Evidence summary | Open questions | Blocking issues | Last verified |
|---|---|---|---|---|---|---|
| Land control | Unknown | unknown | Unknown | Unknown | Unknown | Unknown |
| Contiguous land | Unknown | unknown | Unknown |
Every source cited by the accepted facts in this dossier.
| Title | Publisher | Tier | Type | Published | Retrieved |
|---|---|---|---|---|---|
| Helios Data Center Campus - sec.gov | sec.gov | T3 | news article | Unknown | 2026-07-12 |
| Unknown |
| reported |
| low |
| Unknown |
| Unknown |
| Grid path | Unknown | unknown | Unknown | Unknown | Unknown | Unknown |
| BTM readiness | Unknown | unknown | Unknown | Unknown | Unknown | Unknown |
| Fuel supply | Unknown | unknown | Unknown | Unknown | Unknown | Unknown |
| Water | Unknown | unknown | Unknown | Unknown | Unknown | Unknown |
| Fiber | Unknown | unknown | Unknown | Unknown | Unknown | Unknown |
| Permitting | Unknown | unknown | Unknown | Unknown | Unknown | Unknown |
| Equipment | Unknown | unknown | Unknown | Unknown | Unknown | Unknown |
| Financing | Unknown | unknown | Unknown | Unknown | Unknown | Unknown |
| Offtake | Unknown | unknown | Unknown | Unknown | Unknown | Unknown |
| Construction | Unknown | unknown | Unknown | Unknown | Unknown | Unknown |
| Community & political | Unknown | unknown | Unknown | Unknown | Unknown | Unknown |